+1-316-444-1378

1) Why was the productivity of the
Safelite installers so low?
2)Does the proposed PPP plan
address the problems described in
question 1? Does it introduce new
problems? Explain.
3) What are the pros and cons of
switching from wage rates to piece
rate pay? Are Safelite installers good
candidates for piece-rate pay? Why or
why not?
4)Should there be a guaranteed
wage? If so, how should it be set?
5) What are the likely consequences of
a switch from wage to piece rates for:

Answering the above question based on the attached file