+1-316-444-1378

Brief – Write an academic report in the required format, which addresses all the following points in relation to the Lusails stadium in Qatar with a capacity of 80,000 people- venue for the 2022 FIFA World Cup.

1.(10% of marks, 200 words) Introduction Identify the importance of supply chain in Lusails stadium project  

2. (15% of marks, Application-based Diagram) Carry out a stakeholder analysis for the project and create a Stakeholder Analysis chart with at least 10 of the main parties who have an interest in the Lusails stadium project.  These may be individual, organisations, groups etc.  

3.(15% of marks, for the Application-based Diagram: 5% for Probability Impact Grid and 10% for Risk Register) Carry out a risk analysis for the Lusails stadium project and create a risk register with at least 10 risk events. Include the estimated probability, severity, and impact before and after the planned response 

4.(50% of marks) Critically evaluate on 

(15%) How the knowledge of Procurement helps Project Manager to successfully complete the project? 

(10%) Discuss the application of strategic tools Lean or Agile or combination of both in Lusails Stadium Project. 

(15%) Discuss the importance, challenges, and benefits in employing the techniques Stakeholder Engagement and Risk Register in Lusails Stadium Project 

(10%) From a project managers perspective, analyse the impact of challenges posed by change requests in the construction project 

5.(10%of marks,200 words) Conclusion and recommendations 

6.Appendix – To include additional diagrams/figures to enhance the writing if needed

7.Presentation format required:

(1)Font Aerial, size 12; 1.5-line space; text justified on the left and right of the page

(2)Use relevant graphics in each section, with full citations.

Structure to Follow:

(1)Table of Contents

(2)Introduction

(3)Stakeholder Analysis Chart 

(4)Risk Assessment diagram

(5)Critical Analysis

(6)Conclusion/Recommendation 

(7)Appendix (optional)

Categories: Uncategorized