+1-316-444-1378

For Example 15: Build a SimQuick simulation for this multilevel supply chain.

Exercise 15: For each scenario (row) in the following table, run 40 simulations and report the mean of the overall mean service levels for the two stores and the estimated total cost. Based on the overall mean service levels, which scenario should management adopt?

Categories: Uncategorized